Monday, June 1, 2015
Team Parks recently completed a 3,800 square foot tenant improvement for Laser Components Pyro Group Inc. consisting of several offices, conference room, manufacturing and test spaces and a 1,018 sf ISO 7 clean room to be used for assembly and material processing of the company’s products. The clean room includes a dressing area, material processing room and assembly room requiring a separate high performance air-conditioning system. The clean room will be used to manufacture high performance pyroelectric IR detectors. These are used in various chemical identification apparatus in the industrial, safety and research industries.
Alan Doctor, CEO and General Manager explains, “our GC, Team Parks did a fantastic job for us. They came in at just around budget and basically to schedule. They were great to work with and I would certainly use them again! “
Ryan Strom, President of Team Parks, notes “Alan and his entire group were very easy to communicate and work with. The technical requirements for this tenant improvement were not typical, but our staff worked hard to understand how all of the components aligned, and were able to perform in a timely manner to produce a successful build-out.”
Team parks, a Stuart based General Contractor since 1977, provides services in general construction, design build, construction management, tenant build-outs and green building for commercial projects along with residential new construction and renovations. They may be reached at (772) 781-1616 or admin@teamparksinc.com